BOE-571-A (P4) REV.27 (05-23)
 
SCHEDULE E – COST DETAIL: BUILDINGS, BUILDING IMPROVEMENTS, AND/OR LEASEHOLD IMPROVEMENTS, LAND AND LAND DEVELOPMENT
LINES 62-86. Report by calendar year of acquisition the original or allocated costs (per your books and records) of buildings and building or leasehold improvements; land improvements; land and land development owned by you at this location on January 1. Include finance charges for buildings or improvements which have been constructed for an enterprise's own use. If no finance charges were incurred because funding was supplied by the owner, then indicate so in the remarks. In the appropriate column enter costs, including cost of fully depreciated items, by the calendar year of acquisition and total each column. Do not include items that are reported in Schedule C. With respect to Columns A and B, segregate the buildings and building or leasehold improvements into the two requested categories (items which have dual function will be classified according to their primary function).
If you had any additions or disposals reported in Columns A, B, C, or D during the period of January 1 through December 31 of the tax year, complete the schedules at lines 87-88 showing the month and year and description of each addition and disposal.
(87) IMPROVEMENTS ADDED OR REMOVED. List and describe additions or alterations made during the twelve months preceding January 1 to buildings, structures, pumps, permanent pipelines or other items attached to the land. Enter the cost of any such changes. List and describe any removals giving the year of acquisition and original cost, if known. Enter the month and year the addition, alteration, or removal was completed. If not completed on January 1, enter "CIP" (construction in progress).
(88) CHANGES TO THE LAND SURFACE. Describe any changes made during the twelve months preceding January 1 in the surface of the land, such as leveling, ripping, drainage, well drilling, etc. Enter the cost of such changes, and acres changed. Enter the month and year the changes were completed. If not completed on January 1, enter "CIP" (construction in progress).